Filters
Question type

Study Flashcards

Which of the following includes a common reason why change occurs?


A) A misunderstanding of the initial scope
B) Shifts in planned technology that force unexpected and significant changes to the business
C) An omission in defining initial scope
D) All of the above

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

Which of the following is an issue related to the waterfall methodology?


A) Flaws in accurately defining and articulating the business problem
B) Managing costs,resources,and time constraints
C) Assumes users can specify all business requirements in advance
D) All of the above

E) C) and D)
F) A) and D)

Correct Answer

verifed

verified

What are project objectives?


A) Quantifiable criteria that must be met for the project to be considered a success
B) Products,services,or processes that are not specifically a part of the project
C) Any measurable,tangible,verifiable outcome,result or item that is produced to complete a project or part of a project
D) Defines the work that must be completed to deliver a product with the specified features and functions

E) B) and C)
F) None of the above

Correct Answer

verifed

verified

Project ________________ are factors considered to be true,real,or certain without proof or demonstration.

Correct Answer

verifed

verified

Post-implementation reports are formal reports or audits of a project after it is up-and-running.

A) True
B) False

Correct Answer

verifed

verified

A(n)__________ chart is a simple bar chart that depicts project tasks against a calendar.

Correct Answer

verifed

verified

What is a graphical network model that depicts a project's tasks and the relationships between those tasks?


A) Gantt chart
B) PERT chart
C) Dependency
D) All of the above

E) A) and D)
F) B) and C)

Correct Answer

verifed

verified

Project objectives are quantifiable criteria that must be met for the project to be considered a success.

A) True
B) False

Correct Answer

verifed

verified

Which implementation uses both the legacy system and new system until all users verifies that the new system functions correctly?


A) Parallel implementation
B) Plunge implementation
C) Pilot implementation
D) Phased implementation

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Conversion modifies software to meet specific user or business requirements.

A) True
B) False

Correct Answer

verifed

verified

What determines if the system satisfies the user and business requirements?


A) Alpha testing
B) Development testing
C) Integration testing
D) User acceptance testing

E) All of the above
F) C) and D)

Correct Answer

verifed

verified

Which methodology is owned by IBM?


A) SCRUM
B) XP
C) RAD
D) RUP

E) All of the above
F) A) and C)

Correct Answer

verifed

verified

Corrective maintenance makes system changes to reduce the chance of future system failure.

A) True
B) False

Correct Answer

verifed

verified

Which document prioritizes all of the business requirements by order of importance to the company?


A) Requirements documentation
B) Requirements management
C) Requirements definition document
D) All of the above

E) C) and D)
F) All of the above

Correct Answer

verifed

verified

Which methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements?


A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming

E) All of the above
F) C) and D)

Correct Answer

verifed

verified

_____________ implementation is a small group of people use the new system until it is verified that it works correctly then the remaining users migrate.

Correct Answer

verifed

verified

What modifies software to meet specific user or business requirements?


A) Software customization
B) Conversion
C) Business requirements
D) Sign-off

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

Software ______________ is a disciplined approach for constructing information systems through the use of common methods,techniques,or tools.

Correct Answer

verifed

verified

A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.

A) True
B) False

Correct Answer

verifed

verified

_____________ testing assess if the entire system meets the design requirements of the users.

Correct Answer

verifed

verified

Showing 61 - 80 of 293